Board Insulation
Step 1. Determine the height you want your flashing to be and install your insulation just below this location.

Step 2. Secure the Termination Bar Exender to the backup wall and fasten through the top leg every 8”.

Step 3. Install the MaxSeal transition membrane starting from the outer horizontal edge of the Termination Bar Extender.

Step 4. Use a compatible sealant or T-96 Termination Bar to terminate the MaxSeal transition membrane.

Step 5. Install insulation on top of the Termination Bar Extender.

Step 6. Install your desired TWF on the downward leg of the Termination Bar Extender using a flat Termination Bar.

Step 1. Determine the height you want your flashing to be and install the Termination Bar Extender at this location.

Step 2. Install the MaxSeal transition membrane starting from the outer horizontal edge of the Termination Bar Extender.

Step 3. Use a compatible sealant or T-96 Termination Bar to terminate the MaxSeal transition membrane.

Step 4. Install the spray foam insulation above and below the Termination Bar Extender.

Step 5. Install your desired TWF on the downward leg of the Termination Bar Extender using a flat Termination Bar.

Step 1. Determine the height you want your flashing to be and install the Termination Bar Extender at this location.

Step 2. Install the MaxSeal transition membrane starting from the outer horizontal edge of the Termination Bar Extender.

Step 3. Use a compatible sealant or T-96 Termination Bar to terminate the MaxSeal transition membrane.

Step 4. Install the spray foam insulation above and below the Termination Bar Extender.

Step 5. Install the masonry, lentil, window, and through-wall flashing accessories with a compatible sealant.

Step 6. Install your desired TWF on the downward leg of the Termination Bar Extender using a flat Termination Bar.